Project impacts and mitigation measure, and comprises of the following:Įnvironmental management plan (EMP) including guidelines for Construction MethodĮnvironment monitoring plan (EMoP), public disclosure and grievance redress mechanismĪvian data - bird vantage point surveys at four locations, flight path studies and sector countsĪlong wind farm blocks conducted by Dr. This environmental impact assessment (EIA) was prepared according to the requirements of theĪsian Development Bank (ADB)’s Safeguard Policy Statement (SPS) 2009 for evaluation of These studies were conducted between 2016Īnd 2017 on behalf of the Project Proponent - The Ceylon Electricity Board (CEB). This document describes the environmental assessment and special studies conducted for theġ00 MW Wind Power Project in Mannar, Sri Lanka. Management Department, the Project Approving AuthorityĬonsent Letters from Stakeholders to CEB’s 100 MW Wind FarmĬonsolidated Summary of Public ConsultationsĪnnexure 10: Terms of Reference for Biodiversity Management PlanĪnnexure 11: Addressing Noise issues in sleeping areas 35 of 2007Ģ.5 Safeguard Policy Statement (SPS) 2009 of the Asian Development Bankģ.2 Major components of the proposed wind farmĤ.0 DESCRIPTION OF ENVIRONMENT (BASELINE DATA)Ĥ.2 Ecological environment (Terrestrial and Aquatic)Ĥ.7 Infrastructure facilities in Project Areaĥ.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURESĥ.1 Environment Impacts and Mitigation Measuresĥ.2 Environment problems due to project location and designĥ.3 Environmental Impacts Associated with Pre-Construction Stageĥ.4 Environmental Problems Associated with Construction Stageĥ.5 Environmental impacts associated with operational stageĦ.1 CEB’S Approach for Wind Power Site SelectionĦ.3 The “with project alternative” Wind Farm site selectionħ.0 INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATIONħ.1 Information Disclosure and Public ConsultationsĨ.2 The Grievance Redress Mechanism and PUCSLĩ.4.1 Environmental Monitoring Plan (EMoP)ĩ.5 Environmental Management and Monitoring Plan Budget CostsĪpplicable Environmental Policy and ProceduresĮnvironment Management Plan (EMP) including Checklist for constructionĮnvironmental Parameters and Periodicity for Environmental MonitoringĮnvironmental Safeguard Monitoring ReportĪpproval letter of IEE by Coast Conservation and Coastal Resource Of or reference to a particular territory or geographic area in this document, the Asianĭevelopment Bank does not intend to make any judgments as to the legal or other status of anyġ.4 Purpose and structure of the EIA documentĢ.0 POLICY, LEGAL, AND ADMINISTRATIVE FRAMEWORKĢ.1 Applicable Sri Lankan Environmental Regulations and other LegislationsĢ.2 Sri Lankan Health and Safety LegislationĢ.3 Sri Lanka Sustainable Energy Authority Act, No. In preparing any country program or strategy, financing any project, or by making any designation ![]() Your attention is directed to the “terms of use” section on ADB’s Herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and This environmental impact assessment is a document of the borrower. In this report, “$” refers to US dollars. Land Acquisition and Resettlement Committee ![]() The draft originally posted in May 2017 on Įngineering, procurement and construction Socialist Republic of Sri Lanka for the Asian Development Bank. Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, Democratic ![]() Learn more hereWind Power Generation Project (RRP SRI 49345) NOTICE: The text below was created automatically and may contain errors and differences from the contract's original PDF file.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |